In Revit, unfortunately, it's not possible to make a schedules sheet. But often on the first sheet of the general data it is necessary to do this with the name of the schedule and the sheet number on which the schedule is located. For this purpose you can use the plugin "Schedules sheet".
1. Launching the plugin
2. Setting up the plugin
In the opened window, it is necessary to perform the following settings:
Specify a name for the new schedule.
By analogy with the Project Manager, select the schedules, which are located on the sheets.
When you select a schedule by step 2, it goes straight to window 3 with the schedule name and sheet number.
If you want to use your parameter rather than the system one, select it in the settings.
If you want to save the created set, do it with the appropriate setting.
If you have already made a schedule before, select it and it will be updated.
Click "Done".
3. The result of the operation of the plugin.
As a result, we get a new schedule in the form of the schedules sheet.